Reports
This post contains the 2 main documents we needed to submit to the ESA before the launch campaign. Critical Design Review (CDR) was submitted on 30th March and contains our idea of guided landing described in detail and the Pre Launch Report (PLR) that was submitted on 9th June and contains a description of every aspect of CanSat's operations.